Discussion Forum

How to change time unit in second to hour in result graphic, obtained through a table graph

Thread index  |  Previous thread  |  Next thread  |  Start a new discussion

RSS FeedRSS feed   |   Email notificationsTurn on email notifications   |   1 Reply   Last post: March 21, 2012 5:46pm UTC
Fabio G

Fabio G

March 21, 2012 3:23pm UTC

How to change time unit in second to hour in result graphic, obtained through a table graph

Hello,
I should plot some results (1D plot) and I get a graph in [s], but I need this in [h]; I have seen an old discussion very similar but it is not used the results of a table graph.

Practically, I have set an equation in "global evaluation" and through this one I would plot the results over time, but "global evaluation" gives time results in [s].

The study is time dependent, and in the window "study settings" I'm using 0 (10^(range(-2,0.2,5)))*1[h], but on the right I have however [s]...I guess the problem is there.

Thank you for any suggestion!

Reply  |  Reply with Quote  |  Send private message  |  Report Abuse

Ivar Kjelberg

Ivar Kjelberg

March 21, 2012 5:46pm UTC in response to Fabio G

Re: How to change time unit in second to hour in result graphic, obtained through a table graph

Hi

you must find the appropriate way to express t in t[1/h] for your horizontal axis, depending on the plot you can define an expression for it, ut I'm not sre how to tweak the table graph and I'm not behid my WS so I cannot check

--
Good luck
Ivar

Reply  |  Reply with Quote  |  Send private message  |  Report Abuse


Rules and guidelines