-
Filter by Topic
Release
Popular Topics
- List all discussions
How to change time unit in second to hour in result graphic, obtained through a table graph
|
Thread index | Previous thread | Next thread | Start a new discussion |
March 21, 2012 3:23pm UTC
How to change time unit in second to hour in result graphic, obtained through a table graph
Hello,
I should plot some results (1D plot) and I get a graph in [s], but I need this in [h]; I have seen an old discussion very similar but it is not used the results of a table graph.
Practically, I have set an equation in "global evaluation" and through this one I would plot the results over time, but "global evaluation" gives time results in [s].
The study is time dependent, and in the window "study settings" I'm using 0 (10^(range(-2,0.2,5)))*1[h], but on the right I have however [s]...I guess the problem is there.
Thank you for any suggestion!
Reply | Reply with Quote | Send private message | Report Abuse
March 21, 2012 5:46pm UTC in response to Fabio G
Re: How to change time unit in second to hour in result graphic, obtained through a table graph
Hi
you must find the appropriate way to express t in t[1/h] for your horizontal axis, depending on the plot you can define an expression for it, ut I'm not sre how to tweak the table graph and I'm not behid my WS so I cannot check
--
Good luck
Ivar
Reply | Reply with Quote | Send private message | Report Abuse
Rules and guidelines

