M. Bechis
Prysmian, Italy
The design and testing of high-voltage cables for terrestrial and submarine applications is paramount to Prysmian's business model. A fundamental challenge in designing power transmission systems is optimizing the cables so that they can reliably deliver the required steady-state current while remaining at, or preferably below, the maximum permissible operating temperature. Incorporating multiphysics simulation into the R&D workflow at Prysmian has allowed engineers to design and test cables before constructing prototypes, while also considering unfavorable thermal environments that can be difficult to control in actual experiments. Multiphysics models with transient analysis allowed for evaluating thermal performance of parameterized cable geometries, while incorporating factors such as daily variations in solar irradiation and even current load changes instead of the usual constant current condition. The expanded simulation capabilities at Prysmian have led to improved procedures for cable design and better service to both customers and colleagues.
Suggested Stories
Increasing Productivity and Revenue with Computational Applications
HeatSinkSim is a simulation app created by the specialists at AltaSim Technologies that can help optimize heat sink ...
Keynote: Democratizing In Silico Ablation R&D via Simulation Apps
In this keynote talk from COMSOL Day: MedTech, Marcela Mercado Montoya of IN SILICO STEM introduces the capabilities ...
Multiphysics Simulation Drives Smart City Technology
Traditional power boxes are bulky and too large. To design a power box that is more space-conscious, modular, and ...
Identifying the Root Cause of Electronics Failures with Simulation Apps
The Centre for Electronic Corrosion (CELCORR) research group at the Technical University of Denmark predicts ...
