Discussion Closed This discussion was created more than 6 months ago and has been closed. To start a new discussion with a link back to this one, click here.

Update solution after extension of time

Please login with a confirmed email address before reporting spam

Hello,

If I leave my entire model identical, but change the time dependent solver to run to a longer time (same initial time, same time step) and then hit "Update Solution", how can I make COMSOL use the existing solution up to the previous maximum time, and only calculate the times after this? From the "Progress" tab it appears to be calculating the entire solution again.

Thanks for any help,
Andrew

2 Replies Last Post 07.10.2015, 04:47 GMT-4
Ivar KJELBERG COMSOL Multiphysics(r) fan, retired, former "Senior Expert" at CSEM SA (CH)

Please login with a confirmed email address before reporting spam

Posted: 1 decade ago 26.05.2012, 09:21 GMT-4
Hi

"update solution" will add any new Definitions nodes into an existing solution, or if you have changed anything in the solver settings, it will redo the full simulation.

The best is to add a second time series and set it up to use the previous one as initial values, but check what the Default solver sequence looks like first, and that you have a stored solution in between.

If you prepare two time seriessolver step in the same study, normally the default sovler sequence will set these two in series

--
Good luck
Ivar
Hi "update solution" will add any new Definitions nodes into an existing solution, or if you have changed anything in the solver settings, it will redo the full simulation. The best is to add a second time series and set it up to use the previous one as initial values, but check what the Default solver sequence looks like first, and that you have a stored solution in between. If you prepare two time seriessolver step in the same study, normally the default sovler sequence will set these two in series -- Good luck Ivar

Please login with a confirmed email address before reporting spam

Posted: 1 decade ago 07.10.2015, 04:47 GMT-4
Dear Ivar, I don't have the reference manual. I changed the mesh only of my simulation ( after running first study) and I am thinking what best to do update or compute again. Compute gives error.
Dear Ivar, I don't have the reference manual. I changed the mesh only of my simulation ( after running first study) and I am thinking what best to do update or compute again. Compute gives error.

Note that while COMSOL employees may participate in the discussion forum, COMSOL® software users who are on-subscription should submit their questions via the Support Center for a more comprehensive response from the Technical Support team.