David Scott, UK National Grid, United Kingdom
U.K. National Grid bears responsibility for maintaining the high-voltage transmission network in the U.K. Determining accurate cable ratings (maximum load capacity while staying within temperature ranges) is a significant effort, since they have to maintain reliability, safety, and affordability while dealing with tightly constrained areas, cable congestion, and environmental impacts on cable lines. With multiphysics simulation, U.K. National Grid was able to model the changes in cable performance that stem from soil dryness, cracking, and the proximity of other cables and maximize capacity at minimal costs. Modeling also helped them optimize new cable route installations in accordance with existing routes.
Suggested Stories
Pumping and Injecting from a Single Borehole
Professor Dr. Martin Sauter leads a group at the University of Göttingen in research on hydrogeology. Cooperating with ...
Optimizing a CVD Process for a High-Performance Tungsten Material
Researchers at Forschungszentrum Jülich GmbH, Institute for Energy and Climate Research, and Max Planck Institute for ...
Sea Floor Energy Harvesting
Veryst Engineering has provided design solutions for a variety of industries in the field of energy harvesting. One of ...
Undocking Better Boat Landing Designs for Offshore Wind Turbines
Wood Thilsted, a leader in offshore engineering, used structural analysis to design boat landings that can withstand ...