SIMULATION SUCCESS STORIES

National Grid Predicts Underground Cable Performance with Simulation

Energie

David Scott, UK National Grid, United Kingdom

U.K. National Grid bears responsibility for maintaining the high-voltage transmission network in the U.K. Determining accurate cable ratings (maximum load capacity while staying within temperature ranges) is a significant effort, since they have to maintain reliability, safety, and affordability while dealing with tightly constrained areas, cable congestion, and environmental impacts on cable lines. With multiphysics simulation, U.K. National Grid was able to model the changes in cable performance that stem from soil dryness, cracking, and the proximity of other cables and maximize capacity at minimal costs. Modeling also helped them optimize new cable route installations in accordance with existing routes.

  •  /
1
Loading PDF...

Suggested Stories

The Burning Need for Modeling

The Burning Need for Modeling

Riello Burners manufactures high-efficiency low maintenance burners for use in residential and commercial heating ...

Undocking Better Boat Landing Designs for Offshore Wind Turbines

Undocking Better Boat Landing Designs for Offshore Wind Turbines

Wood Thilsted, a leader in offshore engineering, used structural analysis to design boat landings that can withstand ...

Pumping and Injecting from a Single Borehole

Pumping and Injecting from a Single Borehole

Professor Dr. Martin Sauter leads a group at the University of Göttingen in research on hydrogeology. Cooperating with ...

Modeling Optimizes a Piezoelectric Energy Harvester Used in Car Tires

Modeling Optimizes a Piezoelectric Energy Harvester Used in Car Tires

Siemens is a technology company working with electronics and electrical engineering in industry, energy, and ...