SIMULATION SUCCESS STORIES

National Grid Predicts Underground Cable Performance with Simulation

Energie

David Scott, UK National Grid, United Kingdom

U.K. National Grid bears responsibility for maintaining the high-voltage transmission network in the U.K. Determining accurate cable ratings (maximum load capacity while staying within temperature ranges) is a significant effort, since they have to maintain reliability, safety, and affordability while dealing with tightly constrained areas, cable congestion, and environmental impacts on cable lines. With multiphysics simulation, U.K. National Grid was able to model the changes in cable performance that stem from soil dryness, cracking, and the proximity of other cables and maximize capacity at minimal costs. Modeling also helped them optimize new cable route installations in accordance with existing routes.

  •  /
1
Loading PDF...

Suggested Stories

Designing an Eco-Friendly Anode Baking Process with Numerical Modeling

Designing an Eco-Friendly Anode Baking Process with Numerical Modeling

Aluminum is extracted through the Hall–Héroult process, during which it is removed from bauxite using green anodes. A ...

How Reclosers Ensure a Steady Supply of Power: It’s All in the Magnet

How Reclosers Ensure a Steady Supply of Power: It’s All in the Magnet

When a tree branch touches overhead cables and causes a momentary short circuit, your lights may flicker. A device ...

Simulation Enables the Next Generation of Power Transformers and Shunt ...

Simulation Enables the Next Generation of Power Transformers and Shunt Reactors

From power generation to its distribution to end users, power transformers and shunt reactors are used throughout the ...

Simulation of Magnetic Flux Leakage Inspection

Simulation of Magnetic Flux Leakage Inspection

Salzgitter Mannesmann Forschung (SZMF) advances testing methods for the Salzgitter Group, a leading company that works ...