M. Bechis
Prysmian, Italy
The design and testing of high-voltage cables for terrestrial and submarine applications is paramount to Prysmian's business model. A fundamental challenge in designing power transmission systems is optimizing the cables so that they can reliably deliver the required steady-state current while remaining at, or preferably below, the maximum permissible operating temperature. Incorporating multiphysics simulation into the R&D workflow at Prysmian has allowed engineers to design and test cables before constructing prototypes, while also considering unfavorable thermal environments that can be difficult to control in actual experiments. Multiphysics models with transient analysis allowed for evaluating thermal performance of parameterized cable geometries, while incorporating factors such as daily variations in solar irradiation and even current load changes instead of the usual constant current condition. The expanded simulation capabilities at Prysmian have led to improved procedures for cable design and better service to both customers and colleagues.
Suggested Stories
Improving Gas Pipeline Squeeze-Off Standards with Numerical Simulation
Gas Technology Institute (GTI), a leader in natural gas research, development, and training, investigated industry ...
Multiphase Flow Simulation Guides Wastewater Treatment Plant Design
To improve the health of the Dommel river, an aeration unit has been added to the Eindhoven wastewater treatment plant ...
Modeling the Electrochemistry of Blood Glucose Test Strips
Lifescan Scotland is a medical device company that designs and manufactures blood glucose monitoring kits for the ...
Conjugate Heat Transfer
This is an application brief describing the concept of Conjugate Heat Transfer, which is important in many industrial ...
